How to Optimize Recycling Rates Using Waste Incineration

The improvement of recycling and reuse of waste is becoming more and more important and it is generally preferred compared to waste incineration. In fact, the incineration of waste is often considered the last alternative when recycling of a certain waste fraction is technically not possible or there is simply no market for the corresponding fraction of the waste. But instead of considering waste incineration as being contradictory to recycling, it may also be considered as an alternative way to achieve higher recycling rates. The main goal of waste to energy is the use of the chemical energy contained in the carbon and drogen, and transfer this into thermal energy. But all other elements contained in the waste will of course also be found in the various residue streams leaving the plant. For these residue streams there are possibilities for further treatment, enabling Separation of certain elements, improvement of the quality of a residue stream to allow re-use on the market or even potential for the preparation of a new product.

Apart from increasing the pressure to reuse and recycle, either from the public, or simply due to rising market prices for certain elements, there are also other possible reasons: So far waste incineration is used widespread in industrial countries with clear guidelines for treatment and disposal of the residues such as slag/bottom ash or flue gas treatment residues. These proven ways for disposal of the residues may not be possible in many other countries or especially if solutions for archipelagic states are being considered. In addition the market prices for certain materials may be higher in such states, also justifying higher effort for treatment and separation of the residue streams from a waste incineration plant. And finally, if there are certain residues whichcannot be reused or disposed off within the country itself, the amount shall be minimizedas much as possible in order to reduce the costs for transport to a disposal facility.This article describes the main process steps and the required process technology tooptimize recycling rates for waste incineration plants. Most of it has been built andimplemented in commercial scale facilities by Steinmüller Babcock EnvironmentGmbH. Where a process has not been implemented on commercial scale, tests andstudies have proven that, from a technological point of view, the successful implementation
is possible.



Copyright: © Thomé-Kozmiensky Verlag GmbH
Quelle: Waste Management, Volume 6 (September 2016)
Seiten: 10
Preis inkl. MwSt.: € 0,00
Autor: Till Lemme
Wilfried Frehmann

Artikel weiterleiten Artikel kostenfrei anzeigen Artikel kommentieren


Diese Fachartikel könnten Sie auch interessieren:

Circularity by Design – Können temporäre Wohnformen nachhaltig gestaltet werden?
© Lehrstuhl für Abfallverwertungstechnik und Abfallwirtschaft der Montanuniversität Leoben (11/2020)
Die Umweltauswirkungen verschiedener Wirtschaftssektoren sind angesichts der drohenden Auswirkungen des Klimawandels in den Fokus gerückt. Die Baubranche gilt als ein Sektor mit besonders großen Auswirkungen: Nach Angaben der Europäischen Kommission ist der Bau und die Nutzung von Gebäuden in der EU für fast die Hälfte aller gewonnenen Materialien und des Energieverbrauchs, sowie für etwa ein Drittel des Wasserverbrauchs verantwortlich (European Commission 2014). Daher wurde der Bausektor im Aktionsplan für die Kreislaufwirtschaft als einer der vorrangigen Bereiche definiert (European Commission 2015). In diesem Konferenzbeitrag steht temporäres Wohnen, und damit ein Teilbereich des Bausektors im Mittelpunkt. Darunter versteht man die Bereitstellung von Unterkünften für Menschen für einen bestimmten, zeitlich begrenzten Zeitraum an einem bestimmten Ort.

The Coolsweep Project - establishing common resources across borders within the field of waste-to-energy
© Lehrstuhl für Abfallverwertungstechnik und Abfallwirtschaft der Montanuniversität Leoben (11/2014)
Waste poses a major problem area as well as a great business potential in countries throughout the globe. Therefore, cross-regional collaboration between leading companies, universities, and public authorities is not only necessary to overcome problems of environmental degradation and pollution; it is also good business for everyone. The Coolsweep project aims to support the development of these cross-regional partnerships by establishing research driven collaboration between leading European stakeholders within waste-to-energy. The project partners include five major European cleantech cluster organisations, two universities and one cluster analysis organisation deriving from Italy, Spain, Denmark, Austria, Norway, and Latvia.

Pumpspeicherprojekt PULS - ein wichtiger Baustein fuer die flexible Energieversorgung
© Springer Vieweg | Springer Fachmedien Wiesbaden GmbH (12/2025)
Das von Vattenfall geplante Neubauprojekt PULS ist als Pumpspeicherkraftwerk konzipiert und könnte in Südthüringen, in der Mitte Deutschlands, realisiert werden.

Erfordernis der Öffentlichkeitsbeteiligung bei Änderung oder Erweiterung des Betriebs einer die Schwellenwerte der IE-Richtlinie überschreitenden Anlage
© Lexxion Verlagsgesellschaft mbH (8/2022)
Zu den allgemeinenVorschriften über dasVerfahren bei immissionsschutzrechtlich genehmigungsbedürftigen Anlagen gehört die Öffentlichkeitsbeteiligung. Zweck dieser Beteiligung imförmlichenVerfahrenist es, erheblicheEinwendungen von durch die Anlage Betroffenen rechtzeitig zu hören sowie in der Öffentlichkeit Akzeptanz für das Vorhaben zu erreichen.

Erfahrungen mit der biologischen Abbaubarkeit von kompostierbaren Kaffeekapseln
© Lehrstuhl für Abfallverwertungstechnik und Abfallwirtschaft der Montanuniversität Leoben (11/2020)
In Österreich kommen verstärkt Kaffeekapseln auf den Markt, die als „kompostierbar“ bzw. „biologisch abbaubar“ gekennzeichneten werden. Diese Entwicklung wird von Konsumenten als positiv wahrgenommen, ist jedoch aus abfallwirtschaftlicher und umwelttechnischer Sicht als kritisch zu betrachten. Denn in bisherigen Studien (van der Zee & Molenveld 2020; Rameder 2018; Shrestha et al. 2020), war die Desintegration der zumeist aus PLA bestehenden Kapseln in Labor-versuchen und in der Praxis nach den Anforderungen der EN 13432 nicht in ausrei-chendem Maße gegeben. Die bisherigen Erkenntnisse werden durch die eigenen Ergebnisse der experimentellen Untersuchungen an vier am österreichischen Markt erhältlichen „kompostierbaren“ Kaffeekapseln nur bestätigt. Erfahrungen der österreichischen Abfallwirtschaftsverbände zu dieser Thematik stützen im Wesentlichen die Erkenntnis, dass die derzeitige Entwicklung in Richtung biologisch abbaubare Kunststoffe für das Produkt Kaffeekapsel nach dem derzeitigen Stand der Erkenntnisse und Erfahrungen nicht sinnvoll erscheint.

Name:

Passwort:

 Angemeldet bleiben

Passwort vergessen?

Der ASK Wissenspool
 
Mit Klick auf die jüngste Ausgabe des Content -Partners zeigt sich das gesamte Angebot des Partners
 

Selbst Partner werden?
 
Dann interessiert Sie sicher das ASK win - win Prinzip:
 
ASK stellt kostenlos die Abwicklungs- und Marketingplattform - die Partner stellen den Content.
 
Umsätze werden im Verhältnis 30 zu 70 (70% für den Content Partner) geteilt.
 

Neu in ASK? Dann gleich registrieren und Vorteile nutzen...