Biogas from Municipal and Agricultural Bioorganic Waste: Renewable Energy for China

China became in 2005 the world’s largest coal consumer and second largest user of mineral oil and electricity. The Energy demand in China makes the country already to the second largest CO2 producer worldwide (3,540m t CO2 in 2003) and it’s going to surpass the US in 2009, even though China's per capita CO2 emissions will still be only
three-fifths of the average in industrialised countries in 2030.

The politically recognised drivers to develop renewable energies in China are the constantly growing energy demand in parallel with the need to replace fossil energy and the aspect of climate change and global warming prevention. The potential renewable energy  sources are wide spread, but the availability is restricted. For biogas generation from biomass NDRC considers energy crops, agricultural waste, landfills and sewage sludge. Within this mix of resources bioorganic municipal waste (BMW) is underestimated, as its biogas potential is at least one fourth of the target for feed-in-grid biogas energy in 2020.



Copyright: © Wasteconsult International
Quelle: MBT 2007 (Mai 2007)
Seiten: 18
Preis inkl. MwSt.: € 9,00
Autor: Prof. Dr. habil. Bernhard Raninger
Prof.Dr. Youcai Zhao
Ji Rong
Li Aimin
Prof. Dr. Ing. habil. Werner Bidlingmaier

Artikel weiterleiten In den Warenkorb legen Artikel kommentieren


Diese Fachartikel könnten Sie auch interessieren:

Greece confronted with the new Waste Framework Directive
© Wasteconsult International (6/2010)
This study assessed greenhouse gas emissions of different municipal solid waste treatment technologies currently under assessment in the new regional plan for Attica in the frame of addressing the country’s contemporary waste management challenges.

bifa-Text Nr. 57: Die Abfallwirtschaft im Jahr 2030 - Eine Szenarioanalyse nicht nur für Bayern
© bifa Umweltinstitut GmbH (5/2012)
In einer neuen Studie des bifa Umweltinstituts werden mögliche Entwicklungen der regionalen, nationalen und internationalen Rahmenbedingungen für die bayerische Abfallwirtschaft im Jahr 2030 dargestellt sowie deren Auswirkungen auf die Abfallwirtschaftsstrukturen und auf die Ökoeffizienz. Das Projekt wurde im Auftrag des Bayerischen Staatsministeriums für Umwelt und Gesundheit durchgeführt. Die Ergebnisse bieten auch anderen Behörden, Unternehmen und Verbänden in Deutschland eine Basis für die eigene Positionierung und Strategieentwicklung.

Contractual Framework for the Construction of Waste Treatment Plants
© TK Verlag - Fachverlag für Kreislaufwirtschaft (3/2010)
The construction of large-scale facilities such as waste treatment plants is often set in an international framework. Orders are frequently placed by states, their sub-divisions, public sector or mixed companies. Construction work is always performed by highly specialised firms active in an international environment. Planning, project control and site supervision are also handled by specialised engineering offices active across boundaries.

Sites for Waste Treatment Plants
© TK Verlag - Fachverlag für Kreislaufwirtschaft (3/2010)
There is a well-known quote about the three most important criteria in the real estate industry: location, location, location. After the completion of a project, it is no longer possible to change the location of the facility. In most cases, changes and improvements of a plant at the existing site can only achieve limited relief from existing site-disadvantages, and they require substantial economic costs. This quote on location also applies to waste treatment plants.

Standorte für Abfallbehandlungsanlagen
© TK Verlag - Fachverlag für Kreislaufwirtschaft (3/2010)
Ein bekanntes Zitat betreffend die wichtigsten drei Kriterien in der Immobilenwirtschaft lautet: Lage, Lage, Lage. Den einmal festgelegten Standort für stationäre Anlagen kann man nicht mehr verändern. Änderungen und nachträgliche Sanierungen des Objektes am bestehenden Standort können meist nur bedingt Abhilfe für bestehende Standortnachteile schaffen und erfordern erheblichen wirtschaftlichen Aufwand. Dies gilt auch für Abfallbehandlungsanlagen.

Name:

Passwort:

 Angemeldet bleiben

Passwort vergessen?

Der ASK Wissenspool
 
Mit Klick auf die jüngste Ausgabe des Content -Partners zeigt sich das gesamte Angebot des Partners
 

Selbst Partner werden?
 
Dann interessiert Sie sicher das ASK win - win Prinzip:
 
ASK stellt kostenlos die Abwicklungs- und Marketingplattform - die Partner stellen den Content.
 
Umsätze werden im Verhältnis 30 zu 70 (70% für den Content Partner) geteilt.
 

Neu in ASK? Dann gleich registrieren und Vorteile nutzen...