MBT for a Sustainable Development – Vision 2020

Mechanical-Biological Treatment today is not the ultimate answer to a modern waste management. This paper presents a new, modular Waste Treatment Technology that meets the standards for a sustainable development and is already implemented on industrial scale.

A waste pre-treatment plant is not only a plant, but also the expression of a whole waste management concept. A waste management concept will only then be fit for the future if it fulfils the conditions of sustainability. In waste treatment, the idea of sustainability is represented in the Vision 2020. In 2020 at the latest, the material cycle is to be closed completely accompanied by a high-grade utilisation of secondary products that is as advanced as possible, making landfills unnecessary. However, a discharge of pollutants will still be part of the 2020 reality; a 100 % technical processing does not yet exist.



Copyright: © Wasteconsult International
Quelle: MBT 2007 (Mai 2007)
Seiten: 12
Preis inkl. MwSt.: € 0,00
Autor: Dipl.-Ing. Reinhard Schu

Artikel weiterleiten Artikel kostenfrei anzeigen Artikel kommentieren


Diese Fachartikel könnten Sie auch interessieren:

Greece confronted with the new Waste Framework Directive
© Wasteconsult International (6/2010)
This study assessed greenhouse gas emissions of different municipal solid waste treatment technologies currently under assessment in the new regional plan for Attica in the frame of addressing the country’s contemporary waste management challenges.

Contractual Framework for the Construction of Waste Treatment Plants
© Thomé-Kozmiensky Verlag GmbH (3/2010)
The construction of large-scale facilities such as waste treatment plants is often set in an international framework. Orders are frequently placed by states, their sub-divisions, public sector or mixed companies. Construction work is always performed by highly specialised firms active in an international environment. Planning, project control and site supervision are also handled by specialised engineering offices active across boundaries.

Sites for Waste Treatment Plants
© Thomé-Kozmiensky Verlag GmbH (3/2010)
There is a well-known quote about the three most important criteria in the real estate industry: location, location, location. After the completion of a project, it is no longer possible to change the location of the facility. In most cases, changes and improvements of a plant at the existing site can only achieve limited relief from existing site-disadvantages, and they require substantial economic costs. This quote on location also applies to waste treatment plants.

Systembestellung: Gesamtanlage oder Lose
© Thomé-Kozmiensky Verlag GmbH (3/2010)
Ob eine Anlage in Losen ausgeschrieben oder an einen Generalunternehmer (GU) vergeben werden soll, ist eine gern und häufig geführte Diskussion. Beide Varianten, für die es jeweils viele Pro’s und Con’s gibt, sind in vielen Projekten erfolgreich umgesetzt worden. Wobei die endgültige Entscheidung für die eine oder andere Lösung häufig stark von den für das jeweilige Projekt verantwortlichen Personen abhängig ist. Welche Erfahrungen sie entweder selber mit diesen Alternativen gemacht haben oder Ihnen in der Phase der Entscheidungsfindung näher gebracht wurden.

Stolpersteine auf dem Weg zur Realisierung einer WtE-Anlage in Polen
© Thomé-Kozmiensky Verlag GmbH (3/2010)
Das Siedlungsabfallaufkommen in Polen liegt bei annähernd 12 Millionen Tonnen pro Jahr. Nur westeuropäische Länder wie Deutschland, Großbritannien und Frankreich verfügen über ein höheres jährliches Abfallaufkommen. Jedoch ist das Abfallaufkommen pro Einwohner und Jahr deutlich niedriger als in anderen europäischen Ländern.

Name:

Passwort:

 Angemeldet bleiben

Passwort vergessen?

Der ASK Wissenspool
 
Mit Klick auf die jüngste Ausgabe des Content -Partners zeigt sich das gesamte Angebot des Partners
 

Selbst Partner werden?
 
Dann interessiert Sie sicher das ASK win - win Prinzip:
 
ASK stellt kostenlos die Abwicklungs- und Marketingplattform - die Partner stellen den Content.
 
Umsätze werden im Verhältnis 30 zu 70 (70% für den Content Partner) geteilt.
 

Neu in ASK? Dann gleich registrieren und Vorteile nutzen...