In June 2009, the German Federal Ministry of Environment granted a fund to the German company AWN Umwelt GmbH (Buchen) to establish a mechanical biological treatment plant in the City of Gaobeidian (PR China). The facility is seen as a lighthouse project for GHG mitigation.
In July 2009 the project work was launched. Detailed engineering design has been finalized by Pöyry Environment by October 2009 and the construction works were tendered. The site clearing and the construction of provision infrastructure was finalized by December 2009. In January 2010 the construction of the facility was started and will be finalized by April 2010. It is expected that the facility will run on full operation in summer 2011. Emission reductions of approximately 8.000-25.000 t CO
Copyright: | © Wasteconsult International | |
Quelle: | Waste-to-Resource 2011 (Mai 2011) | |
Seiten: | 12 | |
Preis inkl. MwSt.: | € 0,00 | |
Autor: | Dr.-Ing. Florian Kölsch Dr. Mathias Ginter Prof. Dr.-Ing. Klaus Fricke | |
Artikel weiterleiten | Artikel kostenfrei anzeigen | Artikel kommentieren |
Potential of the Microbial Methane Oxidation to Mitigate Low Gas Emissions of Mechanically and Biologically Treated Waste
© Wasteconsult International (5/2011)
In the framework of the MiMethox-project, financed by the Federal German Ministry of Education and Research, a process study on a MBT landfill is done. The results of a lysimeter study for qualitative and quantitative MBT landfill gas analyzes are introduced.
Optimierung von MBA unter Energieeffizienz-, Ressourcen- und Klimaschutzaspekten
© Wasteconsult International (5/2011)
In 18 von insgesamt 46 in Deutschland betriebenen MBA wird die bei der Behandlung der Siedlungsabfälle verbleibende Restfraktion in Rottestufen biologisch oxidiert ohne Nutzung des Energieinhaltes der biogenen Abfallbestandteile. Im Rahmen einer Studie für das Umweltbundesamt wurde untersucht, in welchem Umfang mit der Nachrüstung von Rotte-MBA mit einer Vergärungsstufe die Energie- und Ressourceneffizienz dieser Anlagen deutlich verbessert werden kann und welche Auswirkungen sich auf die Wirtschaftlichkeit der MBA ergeben.
Municipal Solid Waste bio-drying: odor problem of three configurations
© Wasteconsult International (5/2011)
In the sector of mechanical–biological plants, odor is not related to the presence of only one compound. Thus the management of the related problems is not easy.
Optimization of MBT considering Energy Efficiency and Protection of Resources and Climate
© Wasteconsult International (5/2011)
In 18 out of 46 MBTs in Germany biological treatment of organic-containing fine fractions takes place with the aim of achieving the deposition criteria exclusively through aerobic rotting. Thus energy potentials contained in the fine fractions are not utilized.
Abfallwirtschaft als Klimaschutz
© Universität Kassel (6/2010)
Die originäre Aufgabe der Abfallbeseitigung war und ist es, das im (Rest)Abfall vorhandene Potenzial an für Mensch oder Umwelt gefährlichen Organismen und Stoffen zu minimieren und damit die natürlichen Ressourcen wie Wasser, Boden und Luft vor Verunreinigung schützen. Im Kontext der nachhaltigen Entwicklung hat die Abfallbeseitigung mittlerweile eine weitere Aufgabe erhalten: Sie soll die bereits aus der Erdkruste ausgebeuteten Ressourcen effizient nutzen, damit Primärressourcen schonen und die mit der Primärproduktion verbundenen Emissionen minimieren.